Licensing

Licensing & registration

Registered company
A3M Concept Sdn Bhd — SSM registration no. 201901011262 (1320590-P)
CIDB registration
Grade G2 (tender capacity up to RM500,000 per project). Registered categories: Civil Engineering (CE) and Building (B). Registration number, specialisation codes, and expiry: [TODO:CLIENT].
Experience
Civil engineering works and building construction.
Scope of works
We main-contract works within the Grade G2 limit — renovation, fit-out, smaller civil and building works, and maintenance. For larger projects we work as a subcontractor, or as project manager under our project management service.
Other registrations
[TODO:CLIENT — e.g. Ministry of Finance, local council, trade bodies, if held]

Safety

How we manage safety

Safety is managed on every site through method statements, permit-to-work, site inductions, and PPE compliance. Site supervision follows the requirements of the Occupational Safety and Health Act and CIDB site-safety practice.

[TODO:CLIENT — add a safety record statement once there is a track record to cite, e.g. "0 lost-time injuries, 2025". Publish a versioned, dated safety policy PDF.]

Quality & certification

Certification — on the roadmap

A3M Concept is not currently ISO-certified. We are working toward ISO 9001 (Quality Management) and ISO 45001 (Occupational Health & Safety) as the business grows, and will publish certificate details here once issued. In the meantime our project controls and site-safety practice follow the same principles.

Insurance

Insurance

A3M Concept arranges the insurance appropriate to each engagement — for example contractor all-risk and workmen's compensation cover on construction contracts. Specific policy details are confirmed and shared with the client during procurement for the relevant project.

[TODO:CLIENT — a standing published coverage summary is planned; confirm which policies are held on an annual basis vs. arranged per project.]

Documentation

For procurement

Need a capability statement, method statement, safety plan, or references for a specific project? Tell us what your process requires and we'll provide it directly.

[TODO — publish a downloadable capability statement (PDF) once real project references are approved.]

Need documentation for procurement?

Tell us what your process requires and we'll provide it.